The frequencies on several tram lines were far from adequate for the transport demand, while the position of the equipment actually allowed no service extension. After long puzzling was discovered at the BVM that a service improvement was possible by a clutch of lines 3 and 4 to a 6-shaped route Amsterdamse Poort-molenvliet-Tanah Abang-Kramat-Sawah Besar-Amsterdamse Poort, which was ridden in two directions or if line 3 or line 4. Line 5 was then withdrawn to the stretch Kramat-industrial area and could continue to suffice with a kwartiersdienst, lines 3 and 4 went to now every 12 minutes drive away. Some of the trailers underwent a total change: roof and the upper portions of the side plate avenues were removed, so that one open a cockpit-like total Annex at least in the dry season, got an ideal means of transport.
Sedang diterjemahkan, harap tunggu..
