Nedelanders on October 15, 1947 when the first phase of reconstruction of the just introduced, became the main connection Master-lower city temporarily restored by line 1 via to submit, Sawah Besar while on either side of the said crossing two shuttle lines leave the service maintained by line 1 on the pathways. The lines 1, 2 and 4 were then extended to the Amsterdamse Poort, also line 5 was extended and line 6 to something the Chinese district also returned back. The shuttle line Crossing Noordwijk-harmony was already 5 days later as unnecessary raised. The two classes system was also reintroduced.
Sedang diterjemahkan, harap tunggu..
